All three projects I've had in the works two weeks ago have been completed.
The Schokobaktus made with Schoppelwolle Zauberball in the color 'Schokocreme'

I was a bit too careful on the halfway point, and now have a good 20g of the yarn left, even after using some of it to make two tassels.
The flower trim bag also went pretty well.

The pattern didn't make any mention of lining the bag, but I decided to do so anyway and found the absolutely friggin' perfect fabric for it.

The sewing took at least as long as the knitting (at least it felt like it), but it was very much worth it.
Third project was the hat heel socks. I finished them, and they fit perfectly, but I don't know if I really would ever make a second pair. They are nice enough, but the method is a bit too fiddly for my taste.

Off course I've already have something new on the needle. This here is the start for the mitred stripes tote. The first scare ended up at a solid 40 by 40 cm, though it will shrink a bit once I throw it into the washing machine for the felting.

I don't know, though, if I get a lot of knitting time in next week - the new Zelda game came out last week, so there's a bit of the distraction.
No comments:
Post a Comment